Installed with precision: transport and on-site positioning of the modules
The transport of the equipment, carried out as an exceptional convoy, was also subject to a prior logistics study by our purchasing and logistics department, particularly to manage building access constraints.
The on-site installation was meticulous: each element was positioned with millimeter precision to integrate perfectly into the existing building, without disrupting daily site operations.
Discover the timelapse!
A collaboration at the heart of success
This project is also a story of collaboration. Regular exchanges with the teams from TotalEnergies Lubricants and Transports Mermet made it possible to continuously refine the design to closely match operational needs.
In the end, thanks to over 70 years of expertise as a manufacturer of containerized fuel stations, Blocalps mobilized all its capabilities—engineering, manufacturing, integration, and logistics—to address multiple constraints:
Chemical compatibility of fluids
Integration into an existing building with space constraints and limited access, including tanker truck circulation
Securing flows through an automated anti-mixing system
Optimization of intervention timelines to reduce impact on site operations